Data center backup generator permits with stated counts and ratings

6 data center projects in our Indiana and Georgia samples whose government records give the number and rating of backup generators. Records dated April 18 to October 18, 2026. A permit lists planned equipment; it is not a purchase order.

Lavender Fields Holdings data center expansion, 402 Royal Road (Google Michigan City)

LaPorte County, Indiana

Record
Air permit, Sep 25, 2026. in.gov
Applicant as named
Lavender Fields Holdings, LLC
Stage
Permit pending
Equipment stated
Draft modification Section A.2: 66 new diesel emergency generators GEN67 to GEN132 at 3,490 kWe (4,680 bhp) each, plus one ancillary generator HUB1 at 167.6 bhp, and 67 new belly tanks of 5,373 gallons each. Known inconsistency: the public notice says 67 critical emergency generators; HUB1 may account for the difference, but no document says so. Existing site: 66 critical emergency generators GEN1 to GEN66 at 2,750 kWe. The modification also proposes removing 2 existing generators and their belly tanks, without naming which. HVO is the secondary fuel; one closed loop air cooling system.
Next public date
Nov 17, 2026: IDEM virtual public hearing on the draft modification; the extended comment period ends Nov 23, 2026
More
Full project page

Amazon Data Services data center campus, 2938-2778 County Rd 1350 N, Wheatfield

Jasper County, Indiana

Record
Air permit, Sep 24, 2026. in.gov
Applicant as named
Amazon Data Services, Inc.
Stage
Permit pending
Equipment stated
Draft permit Section A.2: 384 diesel critical emergency generators CEG1 to CEG384 at 2,750 kWe (4,043 bhp) each, each with SCR and cDPF. Known inconsistency: Section D.1 also describes 384 generators but lists their control systems as CE1 to CE234 (Section A.2 says CE1 to CE384), and the D.1.5 CO equation refers to CEG1 to CEG234. Also listed: 1 ancillary generator at 1,600 kWe for the water treatment system; 4 house generators HG1 to HG4 at 750 kWe; 384 generator fuel tanks CEG BT 1 to 384 (likely belly tanks) of 6,500 gallons each; 14 bulk tanks of 12,000 gallons each.
Next public date
Nov 10, 2026: IDEM virtual public hearing on the draft permit; the extended comment period ends Nov 16, 2026
More
Full project page

Amazon Data Services New Carlisle campus generator modification, 31100 State Road Highway 2

St. Joseph County, Indiana

Record
Air permit, Aug 17, 2026. in.gov
Applicant as named
Amazon Data Services, Inc
Stage
Operating site, expansion
Equipment stated
Draft modification: two ancillary emergency generators AWB1 and AWB2 at 1,600 kWe each, approved in 2026 for construction; the permit also lists 234 critical emergency generators at 2,750 kWe (4,043 bhp) constructed in 2025 and 2026, 9 house generators at 750 kWe, and ancillary units at 400 and 250 kWe. Separate draft posted Oct 19, 2026: a new building with one new diesel emergency generator and diesel tanks, rating not stated.
Next public date
Nov 18, 2026: End of the public comment period on the new IDEM draft modification for a new generator building at the same campus

Orla LLC data center, 3062 West SR 32, Lebanon

Boone County, Indiana

Record
Air permit, Jul 11, 2026. in.gov
Applicant as named
Orla, LLC
Stage
Under construction
Equipment stated
Orla permit: 12 diesel emergency generators EG1 to EG12 at 4,376 bhp each (draft offered a Caterpillar or a Cummins option; the final permit names no make), HVO as secondary fuel; 2 diesel fire pumps at 224 bhp; 12 belly tanks of 7,185 gallons. Life Cycle Power permit, treated by IDEM as one source with Orla: 65 natural gas Caterpillar G3516H engine generators GEN1 to GEN65 at 2,763 hp each with SCR and oxidation catalysts, and 2 regasification boilers at 5.4 MMBtu/hr.

Google Monrovia data center (Woodland Caribou LLC air permit at 1598 W SR 42)

Monrovia area, Morgan County, Indiana

Record
Utility commission docket, Apr 22, 2026. in.gov
Applicant as named
AES Indiana for a subsidiary of Alphabet Inc. (utility docket); Woodland Caribou LLC (air permit)
Stage
Under construction
Equipment stated
Draft air permit T109-50085-00094 for Woodland Caribou LLC, 1598 W SR 42, Mooresville (Morgan County): 132 diesel emergency generators at 4,043 bhp (3,015 kW) and 34 at 3,569 bhp (about 2,661 kW); 3 wastewater treatment plant generators at 4,043 bhp (3,015 kW); smaller boost, fire pump, lift station, site entrance, warehouse and administrative generators; 179 diesel tanks of up to 5,373 gallons; 36 cooling towers at 6,000 gpm each. Known inconsistencies: the permit numbers the 34 units Gen 132 to Gen 166, which overlaps Gen 132 and spans 35 numbers; Section D.1(a) describes all 166 generators at 4,043 bhp, conflicting with the 3,569 bhp rating in D.1(b). IURC order: new Antioch switchyard with a STATCOM, new Blue Bluff switchyard, double circuit 345 kV lines, 200 MW Foundry Works battery, 130 MW Hardy Hills battery, 130 MW Crosstrack solar with a 130 MW battery. The batteries and solar are utility resources, not on the data center site.
More
Full project page

Core Scientific Dalton 01 (2205 Industrial South Road)

Whitfield County, Georgia

Record
Air permit, May 27, 2026. epd.georgia.gov
Applicant as named
Core Scientific Dalton 01 (facility name on record)
Stage
Operating site, expansion
Equipment stated
Construction and installation of 8 standby diesel generators with a total maximum output of 21.6 MW to back up commercial power for the site (EPD application 29946).

These projects come from the free Indiana and Georgia sample reports. A full report lists every project found in one state's government records from the last six months, with equipment counts and ratings, next public dates, the buying window and a suggested next research step for each.